ChannelVessel Intelligent Equipment Co., Ltd. Contact Us

SS304 / SS316L / Custom Configurations

Stainless Steel Mixing Tanks

Configure a stainless steel mixing tank around your product, working batch and cleaning requirements. ChannelVessel builds custom mixing vessels with project-specific product-contact materials, agitation, surface finishes, connections and heating or cooling options.

Start with a 300, 500, 1,000, 2,000, 3,000 or 5,000 L working-batch requirement, or specify another volume. The proposed configuration defines the gross capacity, drive selection and equipment included in your quotation.

  • Material specified by component.
  • Agitation selected for the duty.
  • Supply scope clearly defined.

Share your product and required batch size. Include a drawing or existing specification when available.

Stainless steel mixing tank with top-mounted motor, stainless steel vessel, support legs and bottom discharge in a clean industrial workshop

Configuration Options

Choose the Configuration Your Process Needs

Start with what the tank must do, then select the construction and equipment. Discuss liquid blends, personal-care preparations, detergent formulations or other compatible process liquids together with their temperature, viscosity and cleaning requirements.

No Integrated Jacket

Single-Wall Mixing

For blending duties without an integrated heating or cooling jacket. Specify the charging arrangement, agitator, discharge connection and access needed between batches. Open-top and covered arrangements can be considered for the application.

Temperature Control

Jacketed Mixing

For batches requiring controlled heating, cooling or temperature holding. Select the jacket around the thermal duty and available utilities, with insulation where required. Identify whether the order includes only the jacket or also the heating and circulation equipment.

Optional Separate Drive

Mixing with a Separate High-Shear Stage

For processes requiring dispersion or emulsification in addition to bulk circulation. A separately specified high-shear mixer can be combined with the vessel agitator where the formulation requires it. Its drive and controls are listed independently.

These are configuration starting points, not three fixed models. Material, top arrangement, finish, support structure and controls are selected together. Pressure or vacuum duty requires a separately defined design basis.

Capacity & Specifications

Specify Working Volume Before Tank Size

State how much product you need to process in each batch. The figures below are inquiry starting points, not stock-model ratings or a promise that one configuration suits every material.

Working-Batch Inquiry Sizes

Working-batch inquiry sizes and approximate US liquid gallons
Requested working batchApproximate US liquid gallons
300 L79.3
500 L132.1
1,000 L264.2
2,000 L528.3
3,000 L792.5
5,000 L1,320.9
CustomSpecify your required working volume

Gallon values are rounded conversions, not separate model sizes. Specify US or Imperial gallons when submitting your requirement.

Understand the Volume Definitions

Working volume
The product volume to be processed under the agreed operating conditions.
Gross volume
The vessel's total internal capacity, stated separately from the working batch.
Minimum batch
The lowest process volume to be confirmed for the selected impeller arrangement and duty. Do not assume that it is a fixed percentage of gross capacity.

Configuration Details to Confirm

Configuration details and the basis to confirm for a mixing tank inquiry
ItemConfiguration basis
Product-contact metalSS304 or SS316L, specified by component
Vessel constructionOpen or closed top; single-wall or jacketed; insulation where required
AgitationDuty-specific impeller, motor, drive and shaft-speed range
High-shear processingSeparate option with its own drive specification
Surface finishDefined by component, weld treatment and inspection scope
Thermal dutyHeating or cooling requirement and available utilities
Pressure and vacuumVessel and jacket design conditions specified separately
ControlsVariable-speed control; instrumentation or PLC/HMI as specified
Dimensions and connectionsConfirmed on the project drawing and connection schedule
Planning example

A 1,000 L batch at an assumed density of 1.2 kg/L contains 1,200 kg of product. This is product mass only, not the equipment's rated load. Provide density as well as volume when discussing supports, weighing and handling.

Materials & Wetted Parts

Specify 304 or 316L for Every Product-Contact Part

A "316L tank" description is not a complete material specification. Identify the metal and sealing materials for every component that can contact the product, then list the jacket, cladding and supports separately.

SS304

When to Consider SS304

Consider SS304 when a review of the formulation, operating conditions and cleaning chemicals confirms that it is suitable. An industry label such as "food" or "chemical" is not enough to make that decision.

SS316L

When to Consider SS316L

SS316L is a low-carbon, molybdenum-alloyed stainless steel used where increased corrosion resistance is required. It is not resistant to every chemical or chloride exposure. Product concentration, temperature, contact time and cleaning conditions still need review.

Cutaway illustration of stainless steel mixing tank with wetted vessel walls, mixing shaft, impellers, process connections and bottom discharge
Concept illustration: vessel shell, agitator shaft, impeller, connections and discharge. Material grades are defined by the specification, not by appearance.

Define the Material Scope

Stainless steel mixing tank components and their material specification requirements
Component groupWhat to specify
Vessel shell and headsMaterial grade and required material traceability
Agitator shaft and impellersWetted metal grade and any separate surface requirements
Nozzles, valves and sampling partsProduct-contact materials, including purchased components
Gaskets and shaft-seal componentsCompatibility with the product, cleaning chemicals and temperatures
Jacket, outer cladding and supportsNon-product-contact materials, listed separately
Material Review Inputs

Send the formulation or relevant chemical information, including concentrations, chlorides where relevant, process temperatures and cleaning agents. Where traceability is required, define how material documents will be linked to the supplied components.

Surface Finish & Welds

Define the Surface Finish Beyond "Mirror Polished"

A polished appearance is not a measurable acceptance criterion. For a hygienic project, discuss a specified target such as Ra ≤ 0.8 μm for the agreed product-contact areas. This is a proposed specification target, not a statement of measured performance for every vessel.

Polished interior of a stainless steel mixing tank showing smooth walls, welding seams, agitator and internal fittings
Illustrative detail only. Finish measurements, weld acceptance and inspection records must be defined for the actual equipment.
Example Hygienic Finish Target
Ra ≤ 0.8 μm

Agree the finish limit, treatment and inspection scope before manufacture. More demanding requirements need a separate review.

Target for discussion only. The specified areas, weld-treatment scope and inspection method must be agreed for the project.

Specify Finish by Area

A roughness target is meaningful only when its measurement locations and component exclusions are clear. Include these areas in the purchase specification.

Shell and heads
Surface treatment, roughness limit and measurement locations
Product-contact welds
Dressing or polishing scope and the applicable acceptance limit
Nozzles and outlet transitions
Treatment of accessible internal surfaces and local junctions
Purchased valves and fittings
Component-specific finish and any exclusions

Do not assume that a roughness figure for the parent material also covers every weld, fitting or outlet. Specify these areas explicitly and agree how any inaccessible surfaces will be assessed.

Surface roughness is one part of the requirement. Drainability, joints, seals and the cleaning method also belong in the review.

Agitation & Shaft-Seal Selection

Match the Agitator and Seal to the Actual Duty

Choose the mixer around the flow and processing task, not motor power alone. Include how viscosity changes during charging, heating, mixing and discharge.

Circulation & Blending

Liquid circulation and blending

Option to review

Propeller or other suitable axial-flow impeller

Information needed

Batch range, viscosity, density and required circulation

Thicker Products

Wall movement in thicker products

Option to review

Anchor or sweep arrangement; scrapers where needed

Information needed

Product behaviour, heat-transfer duty and wall-contact requirements

High-Shear Duty

Dispersion or emulsification

Option to review

Separately specified rotor-stator high-shear mixer

Information needed

Ingredients, addition sequence and the required processing result

Selection guidance. These are selection directions, not universal viscosity limits. A formulation that thickens during processing may need a different arrangement from a liquid of the same final batch volume.

Separate Drive Specifications

Keep Bulk Agitation and High Shear Separate

Where both are fitted, list the motor power, shaft speed and controls for each drive. A homogenizer rating does not describe the speed or power of the vessel agitator.

Bulk agitation

Identify the impeller, drive, operating speed and batch duty.

High-shear processing

Specify its rotor-stator assembly, separate drive and intended result.

Industrial mixing tank diagram showing impeller options, separate high-shear mixer, and mixing-drive arrangement
Concept comparison only. The actual agitator, optional high-shear mixer and drive ratings are defined for each process.

Shaft-Seal Selection

For shaft-seal selection, identify the product, temperature, pressure or vacuum conditions, cleaning method and contamination-control requirements. Confirm any auxiliary services needed by the proposed seal.

Viscosity Data for Selection

Provide viscosity with its measurement temperature and method when available. A number without its test conditions can leave an important gap in the selection.

Cleaning, Drainage & Maintenance

Plan How the Tank Will Be Cleaned, Emptied and Serviced

Cleaning and discharge requirements belong in the equipment specification, not only in the operating instructions written after delivery.

CIP Configuration Review

Cleaning Access and Coverage

For cleaning-in-place (CIP), identify the cleaning device, supply flow, inlet pressure and temperature. Review the location of shafts, blades, baffles and fittings that may obstruct the spray. Confirm the required conditions at the cleaning device rather than relying only on a pump model.

  • Cleaning device
  • Supply flow
  • Inlet pressure
  • Temperature
Illustration of CIP cleaning spray devices, cleaning supply piping and bottom outlet on a stainless steel mixing tank
Structural illustration only. Cleaning coverage, drainability and any acceptance results are determined for the actual equipment and test conditions.

Discharge and Product Hold-Up

Review the bottom geometry, outlet position, valve and connected pipework together. State whether the product drains by gravity or requires pumping, and provide its discharge temperature and flow behaviour.

Where residual volume matters, agree a test material, drain procedure, elapsed time and measurement method. Avoid an undefined "zero residue" requirement.

Maintenance Access

Check how the lid, agitator, seal and cleaning device can be inspected or removed. Include the available overhead space and access around the outlet and support structure.

Acceptance Criteria

Define What Will Be Verified

Spray-coverage check

Evaluate the agreed spray coverage and inspection areas.

Residue-removal check

Assess removal under a defined cleaning procedure and inspection method.

Drainability test

Measure retained material under specified drain conditions.

A spray-coverage check, a residue-removal check and a drainability test answer different questions. Identify which checks are required and what result is acceptable before agreeing the inspection scope.

Connections, Utilities & Installation

Confirm Connections, Utilities and Installation Space

A tank specification should explain how the equipment fits into the production line. Send the site layout, available utilities and mating-connection details with the process brief.

Equipment Interface Checklist

Confirm Before Drawings Are Approved

Product Charging and Discharge

Connection standard, nominal size, position, valve scope and mating equipment

Heating and Cooling

Medium, supply conditions, target temperatures and required batch timing

Electrical Supply

Voltage, phase and frequency; control requirements and installation environment

Instrumentation

Required temperature, level, weighing or other measurements; control-system interfaces

Installation

Equipment envelope, access route, supports and maintenance clearances

Cleaning Supply and Return

Connection details, available flow and pressure, return arrangement and scope

Design Boundaries

Separate the Pressure Conditions

  • Vessel interior
  • Jacket
  • Cleaning-device inlet

Vessel internal pressure, jacket pressure and cleaning-device supply pressure are separate entries. A closed lid is not evidence that a tank is suitable for vacuum or internal pressure. Any such duty must be included in the design review and confirmed in the equipment documentation.

Heating & Cooling Supply Scope

For temperature-controlled processes, state whether the project needs only a jacketed vessel or also the heater, chiller, circulation pump and associated controls. Review jacketed mixing tanks for the thermal configuration, and pressure mixing tanks or vacuum mixing tanks where those duties apply.

Installation Envelope vs. Shipping Size

Use equipment dimensions for installation planning. Shipping-crate dimensions belong in the logistics information, not the floor-layout specification.

Inspection & Handover Documentation

Agree the Inspection and Document Package Before Manufacture

Make inspection part of the purchase specification. Identify the records required, the checks included and any stages that need customer review or witnessing.

Inspection & Documentation Matrix

Project-Specific Scope to Agree
Review AreaScope to Agree
MaterialsComponent material list, required certificates and traceability method
Dimensions and ConnectionsDrawing revision, key measurements, interface checks and any agreed tolerances
Welds and SurfacesInspection scope, finish requirements, locations and acceptance method
Mechanical and Electrical FunctionsAgitator operation, specified controls, instruments and agreed safety functions
Vessel and Jacket IntegrityApplicable examination or testing for the specified design conditions
Handover DocumentsAgreed drawings, operating information and inspection records
FAT Planning

Make Performance Acceptance Specific

Where mixing performance is part of factory acceptance testing (FAT), agree the test material, batch volume, temperature, mixer settings, sampling plan, analysis method and acceptance criterion.

  • Test material
  • Batch volume
  • Temperature
  • Mixer settings
  • Sampling plan
  • Analysis method
  • Acceptance criterion

Keep Test Evidence in Context

An unloaded run, a water trial and a production-material trial are different forms of evidence. Each report should identify what was tested and the conditions used; it should not imply results for an untested formulation.

Confirm Required Certification

Specify any required certification, independent inspection or documentation format before quotation. The applicable equipment scope and supporting documents must be confirmed for the project.

Supply Scope & Pricing

Compare Complete Supply Scope, Not Capacity Alone

Two quotations for the same nominal capacity may cover very different equipment. Start by identifying which supply package you need, then compare the detailed inclusions and exclusions.

Supply Package Comparison

Scope to Define
Vessel Only
Tank, supports, connections and the agreed preparation for any separately supplied mixer
Vessel with Agitation
Vessel plus the specified mixer, drive, seal and the agreed control scope
Integrated Mixing Package
Defined combination of vessel, agitation, instruments, controls and selected auxiliary equipment

Scope matters: “Integrated” does not automatically include every pump, heater, chiller or site service. List each item rather than relying on the package name.

Check These Details Before Comparing Prices

Confirm the working-volume basis, product-contact material scope, weld and surface requirements, mixer configuration and inspection documents. List high-shear equipment, thermal equipment, controls, valves and transfer pumps as included, optional or excluded.

Commercial & Delivery Conditions

The quotation should also identify currency, validity, packaging, delivery basis and destination, freight and tax inclusions or exclusions, and the event that starts the stated lead time. Warranty terms, site work and commissioning support need their own scope.

Send an existing specification or quotation comparison sheet to discuss an equivalent equipment scope instead of comparing capacity labels alone.

Get a Quote

Buyer Questions

Stainless Steel Mixing Tank FAQs

Answers to the practical questions that affect vessel configuration, installation and quotation.

Configuration & Performance

Can I order the vessel without an agitator?

Yes. A vessel-only configuration can be discussed. For an existing or separately sourced mixer, provide its mounting details, loads, shaft and impeller dimensions, and operating requirements so the vessel interface can be reviewed.

Can one tank process several formulations?

Provide the product range, not only the easiest formulation. Compare material compatibility, batch sizes, changes in viscosity, required mixing results and changeover cleaning. A configuration suitable for one product should not be assumed suitable for all of them.

Can a large tank also run small batches?

The minimum batch must be assessed for the selected mixer arrangement and process. Include both your smallest and largest intended batches in the brief. A variable-speed drive alone does not establish the minimum usable volume.

What should I send when viscosity data is unavailable?

Start with the product description, available ingredient information, operating temperatures and an explanation of how it flows or changes during processing. Identify the unknown data clearly. Measurements or a material trial may be needed before the final mixer selection.

Project & Procurement

Can you work around an existing installation?

Send the available floor space, height restrictions, access route and connection locations. A drawing is preferable to dimensions taken only from photographs. State whether an existing mixer, pump or control system must be retained.

Does specifying 316L and a polished finish establish hygienic certification?

No. Material and finish requirements are not a substitute for project-specific certification. Identify the standard and evidence required, then confirm the certificate holder, equipment covered and applicable documentation before placing the order.

How much does a stainless steel mixing tank cost?

Price depends on the defined vessel and equipment scope, not volume alone. Request a quotation stating materials, agitation, finish, thermal equipment, controls, inspection documents and delivery conditions so competing offers can be compared on the same basis.

When does the quoted delivery period start?

Ask the quotation to identify its starting milestone, such as technical and drawing approval or another agreed order condition. Confirm which approvals, supplied components and inspection arrangements affect the schedule. Delivery timing is project-specific.

Technical Inquiry

Get a Stainless Steel Mixing Tank Quote Matched to Your Process

Tell us what you mix, how much you process and which equipment needs to connect to the tank. Start with your product, required working batch and destination; other technical details can be developed during review.

Include operating temperatures, cleaning requirements, any pressure or vacuum duty, available utilities and installation restrictions when known. An existing drawing, equipment specification or product data sheet is useful, but a complete engineering package is not required to start the discussion.

Request a configuration proposal covering the vessel, product-contact materials, agitation, equipment scope and the technical points that still need confirmation.

What to Share With Our Team

Start with these details. Add technical information or drawings if you already have them.

  • Your ProductWhat liquid or formulation will be mixed?
  • Working BatchHow many liters per production batch?
  • DestinationWhere will the equipment be delivered?

Helpful If Available

  • Operating temperatures
  • Cleaning requirements
  • Pressure or vacuum duty
  • Available utilities
  • Installation restrictions
  • Drawings or specifications

A complete engineering package is not required to start.

Scroll to Top
DRAWING & FILE REVIEW

Send Your Drawings

Upload your drawings, datasheets or existing specifications. Our engineering team will review the files and respond with technical feedback.

Engineering Review

Drawings, specifications and process requirements

Confidential File Handling

Project files are used only for technical review and quotation

Faster Technical Feedback

Clearer inputs help us respond more accurately and efficiently

DRAWING & FILE REVIEW

Send Your Drawings

Upload your drawings, datasheets or specifications. Our engineering team will review your files and provide technical feedback.

Contact Form Demo (#3)
Project Protected NDA available
12h Response
ASME / PED
AFTER SUBMISSION
01 Review
→
02 Confirm
→
03 Quote
TECHNICAL QUOTATION

Get a
Technical Quote

Tell us what you need. Our engineering team will review your requirements and respond within 12 hours.

Engineered for Your Application

From concept to certified manufacturing

Global Compliance

ASME, PED and other international standards

Expert Support

Direct access to our engineering team

TECHNICAL QUOTATION

Get a Technical Quote

Tell us what you need. Our engineering team will review your requirements and respond within 12 hours.

Contact Form Demo
Project Protected NDA available
12h Response
ASME / PED
AFTER SUBMISSION
01 Review
→
02 Confirm
→
03 Quote